Weekly final product progress 5

This week we worked on the development of the flexibility of the tube. We meet with Larry and Madi to make the maximum and miminum height the ideal length. We also worked on the clamps. We attached two types of clamps together to make sure that there are enough stability in them. For next week, we plan to create a supporting structure at the bottom to make sure the tubes do not fall. We also will improve the position and constructions of the clamps.