Weekly Final Product Progress 6

This week we finished the first draft of poster. The content is generally good, but the pictures may need updating. It is really satisfying to see what we have already accomplished, and still, of course, there is more to be done next week.

For our product, we figured out the best position for clamps, and we ordered Rhino Grip with our $50.4 budget left. We also found a lager wooden base, and discussed with Larry to think of a way of penetrating the tube through it (the diameter is 1 inch). Besides, we plan to stick a Tac at the top of the cylinder to secure the holdings.

For next week, we will think of a better design using better clamps and attaching techniques. By next week (ideally 11.27), Larry will make a flange with a clamp mechanism to attach it to the base. We will work more on that with Larry.

Happy early Thanksgiving!

One Comment
  1. Wow this is really coming along! I like how you are able to use the power tools that we learned how to use in class. Looks great!

Comments are closed.