Since Spring Break, Turner Construction has been busy preparing the Field House and surrounding area for renovation. A temporary walkway (at right) and stairs are being installed along the Upper Field. This alternate route will allow you to go around the site when the existing walkway is closed for construction.
Inside the Field House, work is under way in advance of the first major step in the renovation: An area of the existing floor will be removed to allow for foundation work associated with the new fitness mezzanine.